Construction Stubdate: No. 508 plants a tower crane in Lake View

https://twitter.com/SigAlfano/status/863160123841294336

Shout-out to Twitter user @sigalfano who let me know, after some guesswork, that a tower crane stub had been planted at No. 508 (508 West Diversey Parkway) on Friday. It joins One South Halsted in the stub group, with full assembly likely while I’m in England. So take pictures and videos of it going up and send them the blog’s way.

This is the only tower crane in the Chicago skies right now for Macon Construction Group, the general contractor tasked with building the 12-story, 53-apartment Pappageorge Haymes design.

 

1136 South Wabash keeps climbing into the South Loop sky

1136 South Wabash

One of Lendlease’s 8 Chicago tower cranes works above 1136 South Wabash in the South Loop.

Ever wonder which general contractors have the most tower cranes in the air around Chicago? Well, for right now, the leader in the clubhouse is Lendlease with 8. Power Construction and McHugh Construction are hot on their heels with 7 apiece.

One of Lendlease’s cranes is busy stacking floors atop floors at 1136 South Wabash. 1136 was previously best known for obscuring Hebru Brantley’s Flyboy mural on the wall of next-door neighbor 1132 South Wabash Avenue. But art lives on, and it’s time to recognize the new Solomon Cordwell Buenz-designed project for bringing 320 new apartments to the South Loop. Developed by CA Ventures, there will also be 143 parking spaces in the 26-story tower. Never mind that you’ll be able to fall out of bed and land in Stan’s Donuts, or Five Guys, or Belly Up Smokehouse, or Eleven City Diner, but 1136 South Wabash is also about 7 long strides from the Roosevelt CTA station. That’s delicious convenience right there.

The Crane Doctor to make a house call at Illume Chicago

Illume Chicago

Putting the Ill in Illume…The tower crane at Illume Chicago needs some repairs.

Expect a street closure Thursday in the 100-block of South Peoria Street, as a street crane sets up to make repairs on the tower crane holding court above Illume Chicago. Weather permitting, repairs shouldn’t last more than a day, and Peoria Street will be back in business Friday.

Construction Update: Ancora at Riverline

Ancora at Riverline at Sunset

Ancora at Riverline, at sunset, from the Harrison Street bridge.

Ancora at Riverline

Ancora from above, courtesy Olin Eargle of @properties.

Call it Ancora, call it Phase One of Riverline, call it whatever you want, but it’s growing. And will continue to do so until it reaches 29 stories. CMK Companies’ first portion of the Riverline development along the Chicago River is making its presence known in the South Loop. The podium has reached the fourth level, while a pair of cores shoot up through the center. You’ll find the best spots to view Lendlease’s handiwork along the Harrison Street bridge.

Pile driving has begun at 1326 South Michigan

1326 South Michigan

A few of the first H-piles at 1326 South Michigan.

If you’re out searching for caisson work, don’t waste your time at 1326 South Michigan. The 46-story, 500-unit tower from Murphy Development Group and CIM Group won’t have them. Instead, the SCB-designed tower will sit atop H-piles, which Stalworth Underground is on site attending to now. According to Stalworth, the South Loop soil simply isn’t made for caisson work, so H-piles will be driven about 90 feet down into the bedrock.

How many H-piles does it take to support a 47-story building? 360, again according to the folks at Stalworth. Each pile is capable of supporting 350 tons, so that’s 252 million pounds of concrete and steel and glass and sofas and appliances that can be supported. Oh, and 190 cars. That’s a decent amount of weight there, too.

Stalworth started driving piles at 1326 South Michigan last week.

Lots more glass as 465 North Park continues to grow

465 North Park

Glassin’ up the joint at 465 North Park in Streeterville.

Back in early April, cladding made an appearance at 465 North Park in Streeterville. Now, as Jupiter Realty’s apartment tower continues to push upward, the glass is spreading throughout the podium. When completed, the 48-story tower designed by Pappageorge Haymes will have (sorry, I chickened out on the math) a whole bunch of windows adorning it’s 444 glassy rental units. Maybe I can’t count all those panels, but I assure you, the Windex people are licking their chops. But if statistics are your thing, there will also be 181 parking spaces and nearly 12,000 square feet of retail and commercial space within 465 North Park. Power Construction is on the build; their task is having the tower ready to open early in 2018.

More from Vista Tower, just because

Wanda Vista Tower May

The two cores of Wanda Vista Tower, Chicago’s best free entertainment.

I could do three posts a week on the changing landscape that is Vista Tower construction. The site looks that different from day to day. The number of small individual projects going into making this one huge project a living, breathing being are fascinating to watch, even when I have no idea what most of it is. Combine that with the viewing platforms of Upper Wacker Drive to the north and the walkways along the south, and Vista Theater provides hours of entertainment for passing construction nerds.

But pulling up a lawn chair and camping out is not only discouraged by nearby residents and construction firms alike, but somewhat impractical in spring’s temperamental weather conditions. I can still offer to go by a few times each month though, and when I do, I’ll share bunches and bunches of photos with you, and then it’s like we’re all camped out there. And remember, when this thing climbs above Upper Wacker level, there won’t be nearly as much to see. You won’t get tired of photos before that happens.

Sound like a plan?

And then there were 32: The Landmark West Loop lowers the tower crane

Landmark West Loop tower crane removal

When the crane disappears behind its own building, that’s a good indication it’s coming down.

Chicago’s ever-fluid tower crane count has changed again, as Landmark West Loop begins to lower its crane at 1035 West Van Buren Street. Landmark topped out March 23, so we knew this day was coming. The loss of this shiny yellow Liebherr EC-12 Litronic model brings our count down to 32.

Landmark West Loop tower crane removal

One South Halsted is waiting for a Liebherr, so…

Caissons begin at Marlowe in River North

Marlowe caissons 675 North Wells

Stalworth Underground drills the first caisson for Marlowe,  675 North Wells Street in River North.

Just over a week after caisson work started on the other side of the block (676 North LaSalle) at The Ardus, caisson work got underway this morning at 675 North Wells Street in River North, home of the future Marlowe development from Lennar Multifamily Companies. Stalworth Underground has the honor of ripping holes in the soil and filling them with concrete for the 15-story, 176-unit apartment project. Antunovich Associates took care of the designs; Power Construction will be on the build.

The good word from Stalworth is there will be 59 bell caissons dug at Marlowe, down to about 80 feet. Diameters range from 2-and-a-half to 3-and-a-half feet, with bells up to 10 feet.

As Hubbard221 nears the top, 412 North Wells rises to the L

You can get a train’s-eye view of 412 North Wells right now by taking a relaxing Brown Line ride from the Merchandise Mart up to the Chicago Ave stop. Linn-Mathes is pushing the 9-story office building skyward, now that the residential tower next door, Hubbard221, is nearly topped out. (Is that 22 stories I count?)

Hubbard221 is the 193-unit apartment tower from developer Centrum Partners and designer Hirsch Associates Architects, the team that just saw a tower crane rise on their Wicker Park Connection property. As for this tower crane, it now has double duty to pull, as it tops off the taller tower while beginning to stretch the smaller structure vertically.