Rush Specialty Hospital steel tops out

RUSH Specialty Hospital. The little tree at top right means they topped out with no injuries.

How about a quick update at RUSH Specialty Hospital?

I was here in June to check out caisson work. Now, the five-story venture between as Rush University Medical Center hospital along with Select Medical has topped out the steel skeleton.

A permit was issued May 23rd for a five-story “inpatient hospital building” at 516 South Loomis. A hoist permit followed on August 9.

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

Make a one-time donation

Choose an amount

¤3.00
¤5.16
¤10.00

Or enter a custom amount


Your contribution is appreciated.

Donate

Permit issued, work underway on Rush Specialty Hospital

A caisson juts from the ground at Harrison & Loomis.

A very busy two-block space on the west side of the city just got a little busier, as Rush University Medical Center began construction on a new RUSH Specialty Hospital facility.

A permit was issued May 23rd for a five-story “inpatient hospital building” at 516 South Loomis. Earlier anticipation of this project may show an address of 1400 West Harrison. Either way, this is the place. Rush is developing the hospital along with Select Medical.

This is what Rush had to say in a news release for the groundbreaking:

Select Medical and Rush University System for Health held a ceremonial ground-breaking to celebrate the new RUSH Specialty Hospital being built on Chicago’s West Side.

The 100-bed facility will be a combined critical illness recovery and inpatient rehabilitation hospital on the RUSH University Medical Center campus. The hospital is slated to open in 2024 and will feature 44 critical illness recovery and 56 inpatient rehabilitation beds. 

“It is the beginning of what will be excellent care for our community,” said RUSH CEO Dr. K. Ranga Rama Krishnan.

To celebrate the construction of the future hospital, RUSH and Select Medical executives were joined by local leaders, including 28th Ward Alderman Jason C. Ervin and Illinois state Rep. Lakesia Collins.

“It’s a phenomenal partnership that speaks to innovation and brings patients the care they need when, where and how they need it,” said RUSH University Medical Center President and CEO Dr. Omar Lateef.

Together as partners, Select Medical and RUSH are delivering a world-class acute to post-acute continuum of care for Chicagoans. 

“The promise of excellence is often achieved through our joint ventures,” said Tom Mullin, executive vice president of hospital operations for Select Medical.

Select Medical and RUSH entered a joint venture partnership agreement on Sept. 24, 2020, to build and manage operations of the new hospital.

In addition to the new RUSH Specialty Hospital, Select Medical contributed 63 of its outpatient centers to the joint venture. Today, those locations are rebranded RUSH Physical Therapy, and the footprint has expanded to 71 centers, including 19 dedicated to pediatrics under the RUSH Kids Physical Therapy brand.

Power Construction is the general contractor, with assistance on concrete from Adjustable Concrete Construction. Stalworth Underground rigs are on site drilling caissons. Like I said, this is a very busy two-block area, with the Joan and Paul Rubschlager Building nearing completion, along with its adjoining parking garage. The photos below include all three projects.

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

Make a one-time donation

Choose an amount

¤1.00
¤3.00
¤5.00

Or enter a custom amount


Your contribution is appreciated.

Donate