UChicago Medicine plants the first of two tower crane seedlings for its new cancer care and research facility

The first of two tower cranes at 5644 South Drexel for UChicago Medicine.

There’s one tower crane base, the first of two, in the ground at 57th and Drexel on the UChicago Medicine campus in Hyde Park. General Contractor Turner Construction, along with concrete contractor Adjustable Concrete Company, will use those cranes to build a new cancer care center for UChicago Medicine. (There’s a ton of info at that ground-breaking link. Read it. They’re doing important work at UChi Med.)

Designed by CannonDesign (more great project info at that link), the facility, scheduled to open to patients in 2027, will be a seven-story, 875,000-square-foot building with 80 inpatient beds.

To date, UChicago Medicine has received permits for:
South tower crane — issued 12/28/23 (addressed as 5644 S. Drexel Ave)
North tower crane — issued 12/12/23
Foundation — issued 12/12/23
Groundbreaking ceremony tent — issued 09/08/23 (I don’t get to post about tent permits very often)
Three demolition permits were issued to clear space for the new facility on 11/07/23:
5627 S Maryland
5631 S Maryland
5635 S Maryland

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago using the form below.

Make a one-time donation

Choose an amount

$1.00
$5.00
$56.44

Or enter a custom amount

$

Your contribution is appreciated.

Donate

Hyde Park Labs (Harper Court Phase II) has topped out

The tower crane that topped out Hyde Park Labs, Hyde Park, Chicago.

As reported by Urbanize Chicago earlier this month, Hyde Park Labs has topped out at 5207 South Harper in the Hyde Park Community Area (and neighborhood.) The 13-story, 302,000-square-foot facility includes a 125-space parking garage, plus nine levels of lab and office space. Its anticipated opening is in the fourth quarter of 2024.

Congrats on the topping out to:

Trammell Crow Company and Beacon Capital Partners, the developers.
Elkus Manfredi Architects, the design architect.
Power Construction, general contractor, with an assist from UJAMAA
Adjustable Concrete Construction, concrete contractor.

I hope you all went to the ground floor and got one of those fried catfish Po-boys and a frozen hurricane.

Photos from February 26 (photos of construction, not of the Po-boys):

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago using the form below.

Make a one-time donation

Choose an amount

$1.00
$5.00
$52.01

Or enter a custom amount

$

Your contribution is appreciated.

Donate

Hyde Park Labs (Harper Court Phase II) has gone 3-D in Hyde Park

Post-demolition, pre-construction for Hyde Park Labs at 5201 South Harper, 3/1/2023.

Made my first visit to Hyde Park Labs (at that link, click on “View Brochure” for everything you’ll ever want to know about Hyde Park Labs) at 5201 South Harper since this was still a fenced-off dirt lot waiting to get started. Well, not only has it started, but the crane’s in the air and the core has risen to — let’s call it the fifth floor. They’re going up to 13.

Let’s see if I have all the players correct on this project, the 2nd phase of Harper Court:

Trammell Crow Company and Beacon Capital Partners are the developers.
Elkus Manfredi Architects is the design architect.
Power Construction is the general contractor, with an assist from UJAMAA
Adjustable Concrete Construction is the concrete contractor.

Now, how ’bout some permit dates:

Demo of the single-story building previously on this site, issued 1/17/2023
Tower crane, issued 2/22/2023
“Selective” demo for existing building & parking garage, issued 4/6/2023
Caissons, issued 5/9/2023
Full build, issued 6/15/2023

And finally, some photos of progress, taken August 21:

Make a one-time donation

Choose an amount

$1.00
$3.00
$10.00

Or enter a custom amount

$

Your contribution is appreciated.

Donate

Stuff That’s Done That I Kept Forgetting To Take Photos Of: University of Chicago Campus North Residential Commons

Jeanne Gang’s Aqua

There was a time when the only building I took photos of was Aqua. It was the first tower I really fell in love with, and it gave me an immediate appreciation of Jeanne Gang’s work at Studio Gang.

As you may know, I’ve taken a few of The Residences at the St. Regis (formerly Vista Tower) too. And Solstice on the Park down in Hyde Park. But as many times as I went down to Hyde Park for Solstice, I kept forgetting to swing by the University of Chicago Campus North Residential Commons. Until now.

Something about the coloring of this development. Standing in front of it, it looks like a rendering.

Studio Gang towers in San Francisco, Brooklyn, and St. Louis are next on my visiting agenda.

Stuff That’s Done: Solstice On The Park

Solstice On The Park, from the park.

The last time I visited Solstice On The Park, it was *almost* done. That was close to a year ago. Now, it’s finished, and being lived in. And still very very cool. I’ll attempt to prove that opinion with the two dozen photos included below.

The basics about Solstice On The Park:

Design Architect – Studio Gang

Developer – Mac Properties

Builder – Linn-Mathes

26 stories, 250 apartments, stunning views from, and of, Hyde Park.

 

Stuff That’s Done: 5252 South Cornell shines in Hyde Park

5252, from the 55th Street Metra Electric Line platform, was made for sunny days.

5252

I like that. Just numbers. 5252.

That’s the name of the recently-opened apartment tower at 5252 South Cornell in Hyde Park. This is a development by Mac Properties, the same folks responsible for bringing Solstice on the Park to this neighborhood. The two of them make a striking pair.

Linn-Mathes was the general contractor on 5252, just as they were on Solstice. Solomon Cordwell Buenz was the design architect, and I want to hi-five everyone there for this one. I lucked out and got here on a sunny day — I know, a sunny day in Chicago, right? — and the building looks fantastic in the sunlight.

The 26-story building contains 246 apartments, from studios to three-bedroom units. 5252 opened in Fall 2019.

 

 

Touch ‘em all, Jeanne: Studio Gang knocks another one out of the…well, you know…

Solstice on the Park May 2018

From the Solstice on the Park website, this is the view from high up in the tower, facing north. It is beyond stunning.

Last week’s visit to Hyde Park to check out the new tower crane at 5252 South Cornell provided another chance to check on progress at Solstice On The Park, the 27-story, 250-unit apartment tower designed by Jeanne Gang at Studio Gang. I’m a sucker for this building, especially on sunny days with blue skies as a backdrop. I wasn’t disappointed. The angles, the glass, the lines. It all works.

General contractor Linn-Mathes looks to be putting the finishing touches on the tower. The view shown above is still available for rent, just so you know.

 

Chicago’s newest and southernmost tower crane is up at 5252 South Cornell

5252 South Cornell tower crane

Chicago’s southernmost tower crane has risen at 5252 South Cornell in Hyde Park.

Earlier this week, we published our Chicago Tower Crane Survey for May 2018, where we noted that a crane at 5252 South Cornell (this thing needs a name) would be erected very soon. As it turns out, very soon was retroactive. A visit Thursday to Hyde Park showed a new, shiny red tower crane atop the construction site, which is where Linn-Mathes is building a 26-story apartment building for Mac Properties. Designed by Solomon Cordwell Buenz, the tower will deliver 246 new apartments to the Hyde Park neighborhood, atop four levels of parking.

It’s Foundation Time at 5252 South Cornell in Hyde Park

There are bright yellow Case Foundation rigs at the corner of 53rd Street and Cornell Avenue in Hyde Park, and you know that must mean foundation work is about to begin at 5252 South Cornell. Curbed Chicago had all the info you need to know about this 26-story tower getting started back in March. But we’ve gleaned from the foundation permit that we can expect 246 apartments atop a four-level parking podium.

Linn-Mathes, the general contractor on 5252 South Cornell, is putting the finishing touches on Solstice on the Park just three blocks to the south of this latest project, so that should be a nice, easy transition for construction crews.

Solstice on the Park nears the finish line

Solstice on the Park March 2018

As this Metra Electric train pulls into the station, so too Solstice on the Park is soon to arrive.

A Spring opening appears imminent for Solstice on the Park, the Studio Gang-designed residential tower in Hyde Park. And since that was the plan all along, the timing is perfect.

The foundation permit for Solstice on the Park was issued back in October of 2016, allowing Linn-Mathes to start building atop what was previously a surface parking lot, with one level of parking underground. That lot is but a distant memory now.

Developer Antheus Capital has about 250 apartments available within the tower. The B.U.C. is eyeing up one of those three-bedroom, south-facing units, with views of Lake Michigan and Jackson Park. We figure we’ll turn one of those bedrooms into an office, just as soon as we do a thorough check through the sofa cushions and honor-box snack station for spare change.

And now, a whole mess of photos of the finished-looking Solstice on the Park residential tower. Congratulations, Hyde Park. This one’s a gem!