1020 West Randolph has topped out in Chicago’s West Loop

The W.E. O’Neil drone (top left) and I at 1020 West Randolph last week.

W.E. O’Neil announced last week they have topped out 1020 West Randolph, the five-story boutique office building in the West Loop. Developed by L3 Capital and RL Edward Partners, and designed by Hartshorne Plunkard Architects, 1020 West Randolph will include 23,000 square feet of office space and 5,000 square feet of retail space. By the looks of the rooftop terrace rendering, I’m going to need to finesse an invite up there once the space is open.

I last (and first) posted about 1020 back in April. And I would understand if you’d assumed I hadn’t stopped by since. But I have, and I humbly apologize to the 1020 West Randolph team for letting photos grow stale on my laptop. So I’ll post them all now, from the old bank building that was demolished, to a visit last week when a drone and I (*a* drone, not *my* drone) were around to see the structure rise to full height. But with newer photos first.

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

1044 West Van Buren upgrades to First Glass

Level 4 gets glass at 1044 West Van Buren

Glazing puns. Ya gotta love ’em.

It’s been a big week for glass on new construction. 1044 West Van Buren is one of those getting in on the fun.

Tandem was busy Wednesday installing windows on the first level above the podium of the Antunovich Associates-designed tower.

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

900 Randolph still doesn’t have gla—-hold that thought

900 Randolph, the 43-story, 300-unit apartment tower from Related Companies and Morris Adjmi Architects, has grown pretty tall out in the West Loop. I’m told crews were pouring concrete on level 37 when I stopped by Wednesday. I was also told to expect topping out early in early October, along with a pleading “we’re hoping the windows arrive by then.” Supply chain delays. Not at all unusual these days.

But Thursday came the above tweet from Twitter user @MrFernGully2U, who captured the first few pieces of glass on the exterior. One day. I got there one day too early. But thanks to the Fern Gully for looking up, and looking out for us.

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

166 North Aberdeen hits the Construction Trifecta: It’s topped out, glassy, and renamed. Hello One Six Six

One Six Six Chicago in the West Loop

166 North Aberdeen used to be on the rise, glassless, and 166 North Aberdeen. You can forget all of that.

One Six Six is now topped out, and the first couple levels above the podium are glazed. Those are all big milestones for the 21-story, 224-unit apartment tower from MCZ Development and Greystar. (The tower topped out two weeks or so ago.) Congratulations are in order for the construction team of Lendlease (GC) and Pepper Construction (concrete) and design architect Solomon Cordwell Buenz.

How that topping out has been achieved, crews need to get the rest of the exterior glazed and the interior ready for One Six Six’s anticipated Fall Opening.

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

As caissons continue, 210 North Aberdeen scores its superstructure permit

Caissons are poured at 210 North Aberdeen

LG Group’s 210 North Aberdeen scored another building permit this week, adding the foundation & and superstructure permit to the caisson permit issued July 5. That means Power Construction (with McHugh Concrete on masonry duty) can continue work up to the 3rd floor, with the full-build permit expected soon.

When complete, the NORR-designed tower will deliver 363 apartments across its 19 stories, while connecting to the Arthur Harris building under renovation. A restoration permit was issued for that portion of the project (216 N Aberdeen) on July 17.

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

160 North Elizabeth renders Chicago’s August tower crane survey obsolete

The topped-out 160 North Elizabeth

“Hey, that’s topped out” I said out loud (I talk to myself constantly when I walk around town) as I neared 160 North Elizabeth in the Fulton Market District. And it usually doesn’t take long for a topped-out tower to drop the tower crane. Sure enough, one day after setting our crane count at 20, came word that we’d already dropped into the teens. Ah, progress.

160 North Elizabeth seemed to go up in a hurry. This is progress by Clark Construction as of Friday, July 29, with the tower crane still intact:

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

Embry plants a tower crane at 21 North May

Embry, 21 North May, West Loop
The Embry tower crane stub. Don’t blink, or you’ll miss it.

The tower crane has been planted, and planted deep, at Embry in the West Loop. So deep, in fact, that I not been tipped off to the first segment being delivered (Thanks, @jrock1449!) I might have walked past the site without noticing it.

Okay, that’s ridiculous. I definitely would have still peered through the fence to see what was going on. But the crane really is planted deep in the ground, so the top base section sits below the height of the construction fence.

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

Checking up on 900 Randolph with CBS Chicago

900 Randolph

Someone from this blog made their television debut last week. You can check out the video from CBS Chicago here:

https://www.cbsnews.com/chicago/news/photographer-catches-images-tracks-progress-of-projects-under-construction-around-chicago/?fbclid=IwAR1Z_dsUqL6L1Q8m2eLkq9hshGj1tSHhr9IGmuCjI770PMwT28TYOF4m82A

You can see the photos I took Thursday of last week while Lauren and Allen (they’re probably tired of hearing this by now, but thank you SO MUCH for doing this with me) watched me (along with a few others I took later in the day) of 900 Randolph here:

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

732 West Randolph makes its tower crane official

Like an injured center, it was tall but unable to play. But this past weekend, the rest of the tower crane went up at 732 West Randolph. I included it in the June survey, since the tower had been erected.

Check out a few shots of people in high places who need not worry about me coming for their jobs:

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

Another new tower crane = more verticality, as 160 North Morgan sprouts from the ground

160 North Morgan is starting to show above the fence line.

160 North Morgan is starting to protrude from the West Loop soil, as GC Walsh Construction begins utilizing that new tower crane they erected at the end of May.

A gentle reminder that 160 North Morgan, a project from Sterling Bay designed by bKL Architecture, will bring 282 apartments and 89 parking spaces in a neat 30-story package. And all of it is happening about half a yard from the Morgan CTA platform. Not to mention the Do-Rite Donuts (apple fritters!) right across the street.

Walsh Construction is on the build. They have received permits for:
– the tower crane on March 30
– the caissons on March 31
– the full build for 30 stories on April 20

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.