There is lumber coming out of the woodwork at 625 West Adams

625 West Adams

From above, 625 West Adams is starting to look three-dimensional.

It’s about wood and scaffolding right now at 625 West Adams in the West Loop. As the future 20-story office tower begins rising above street level, Power Construction crews are climbing and hammering like some sort of Tool Time playground, and Tim Taylor and Al Borland are getting a lot done. Have a look for yourself…

Signage a good sign at Homewood Suites/Hampton Inn

Homewood Suites Hampton Inn

The Hampton Inn & Homewood Suites at 118 North Jefferson has signs stating such.

The new West Loop hotel from Jupiter Realty continues to stride towards completion. The combination Homewood Suites & Hampton Inn is now clearly marked at the top of the south-facing facade.  Designed by VOA Associates, the Homewood/Hampton will have 336 rooms and about 8,000 square feet of retail space, plus 117 indoor parking spots. The building permit also mentions a restaurant on the 24th floor.

Power Construction has been on the job since ground was broken in March 2015. And it looks like they’re close to making Jupiter’s goal of opening the Homewood-Hampton this month. There’s work to do in the lobby, and some mints to put on pillows, but my guess is, folks will be catching shut-eye here within the next two weeks.

 

Still no tower crane, but 171 Aberdeen making foundation progress

171 Aberdeen

It is, admittedly, a cool yellow crane. But it is no tower crane.

Patience is a virtue. But Saturday will mark the four-month mark since a tower crane permit was filed for 171 Aberdeen, the mixed-use project from MCZ Development now underway in the West Loop. Not that foundation work isn’t fun to watch too, but nothing beats a tower crane. Nothing.

The Hartshorne Plunkard Architecture-designed 171 Aberdeen will have 75 luxury apartments, 15,000 square feet of retail, and 40,000 square feet of office space, plus about 130 parking spots. Novak Construction is doing the dirty work.

171 Aberdeen

The Tower Crane Permit.
MAY 10!

 

625 West Adams gets Labor Day permit, allowing more labor

625 West Adams

Watching the construction site at 625 West Adams on Wednesday morning.

625 West Adams has received its ultimate building permit from the City of Chicago, one that will allow for the full build of the 20-story office tower. Workers from Power Construction can be seen on-site this morning, celebrating the permit’s filing by arriving at the job site and going about their business like it’s just another day, That’s professionalism right there, folks. Never get too high, never get too low.

625 West Adams

The full-build permit, filed by the City of Chicago September 6th.

The last, final, ultimate Harpo Studios demolition post

Harpo Studios demolition

One very small section is all that remains of Harpo Studios.

This has to be the last hurrah for Harpo Studios in this space. Because these photos, all taken Tuesday evening, show very little left standing of Oprah Winfrey’s former television studio. By Thursday, my next chance to get over to Washington and Carpenter, there will likely be nothing left but the massive pile of rubble along the west fence.

The demolition of Harpo Studios has turned out to be quite a spectacle in Chicago. Children’s Memorial Hospital has gotten some attention. You don’t hear much about the massive demo project still ongoing at the old Malcolm X College. And the four 100-year-old-plus buildings Rush University Medical Center tore down went with barely a peep. But Oprah’s empire caused a scene. People stopped by to collect a brick memento, take photos, and dream of being in the crowd when everyone got a car one last time.

Who knows. Maybe, when the new McDonald’s corporate headquarters takes over the space, they’ll give everyone a French fry.

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

As Nobu Hotel awaits height decision, caisson equipment arrives

Nobu Hotel caissons

Caisson equipment offloading for the Nobu Hotel in the West Loop.

When the Chicago Plan Commission meets on the 15th of September, one of the decisions they’ll make is whether to allow the West Loop’s Nobu Hotel project to go to eleven. Stories, that is. Per the Commission’s September agenda:

The proposal will establish an 11-story hotel with 119 hotel keys, amenity space for hotel patrons, ground floor restaurant and 35 off-site accessory parking spaces. (27th Ward)

After a big groundbreaking ceremony featuring co-owner Robert “I Heard Some Things” DeNiro back in June, nothing much has happened (besides some soil sampling in July) on the lot along the Randolph Street Restaurant Row. But Thursday, crews could be seen over, under, and around the secretive plywood privacy fencing, offloading caisson equipment. Because whether you know your height allowance or not, you’re still gonna need a foundation.

 

1035 West Van Buren continues its climb along the Eisenhower

1035 West Van Buren

The “back” of 1035 West Van Buren is starting to rise into view of passersby on the Eisenhower Expressway.

Work continues on 1035 West Van Buren, Related Midwest‘s newest residential tower in the West Loop. The tower is beginning to make its presence known at the foot of what will soon be the end of the Jane Byrne Flyover ramp from the Dan Ryan Expressway onto the Eisenhower. The parking podium is up the the fourth floor, while the elevator core continues to climb from within.

The 30-story, 300-unit development by Morris Adjmi Architects of New York City, and Chicago’s own GREC Architects, is expected to be inhabitable before Baby New Year rings in 2018. Lendlease, the general contractor for 1035 West Van Buren, will see to that schedule being met.

625 West Adams putting that shiny new tower crane to good use

625 West Adams

625 West Adams, from above. Hard to tell from up here what kind of heights have been reached at ground level.

625 West Adams is right outside our back window. It has a big yellow tower crane. Perhaps you’ve heard me speak of it a time or two. And while that new-crane smell may have worn off by now, the new crane’s purpose is just beginning.

As Power Construction continues to make progress on the 20-story office tower, that cranes been throwing things around the lot like a champ. And for good reason; there’s a lot of work to be done to have 625 West Adams ready for its debut in early 2018.

625 West Adams 9

Gratuitous Tower-Crane-And-Building-Up-Chicago-Office shot.

 

Another round of demolition photos as Harpo Studios nears the end

There isn’t much left of Harpo Studios. Heneghan Wrecking is seeing to that.

Coming soon: McDonald’s. Not *a* McDonald’s, of course. McDonald’s, as in, Ronald’s office.