Exhibit on Superior: More Photos Than I Know What To Do With

The future 34-story, 298-unit tower from Magellan Development Group at 165 West Superior Street in River North known as Exhibit on Superior lost its tower crane early in July. Albeit a sad one, that’s a big step in the progress cycle. The bKL Architecture design still has a long way to go until completion, but a lot of those construction colors will be fading soon, as the exterior finishes up. Linn-Mathes has been working on this one a full year now.

Still, if you find yourself missing the old Howard Johnson motel that was here, I noticed a mattress lying in the alley behind the new tower. Same thing.

Construction Update: 465 North Park Caisson Work

465 North Park

On the horizon, Case Foundation drills caissons at 465 North Park.

They got their permit July 6th. And time is of the essence. That’s why dirt is flying every which way at 465 North Park.

Case Foundation moved equipment from 625 West Adams over to this lot two weeks ago, reassembled it all, and got to work. They’re drilling caissons for Jupiter Realty Company’s 47-story, 444-unit apartment tower at 465 North Park Drive in Streeterville. Once caissons are done, Power Construction will get to work turning the Pappageorge Haymes Partners design into reality.

Demolition Permit Filed for Harpo Studios

WRECK AND REMOVE A 1 TO 3 STORY CONCRETE COMMERCIAL BUILDING

That’s not just any commercial building. That’s Harpo Studios, the former home of Oprah Winfrey’s television empire. By now, everyone knows McDonald’s will be making its new home on this site, And yesterday, the City of Chicago filed the official demolition permit to knock down what should have been called “StudiOprah.” But no one asked me.

Heneghan Wrecking will do the dirty work of tearing down the building.

Harpo Studios

Harpo Studios, 110 North Carpenter Street.

Harpo Studios

Harpo Studios was doomed the moment the soil sampling rig stepped foot on the lot.

Harpo Studios

When they get around to demolishing this, the southeast corner of Harpo Studios, I’ll have the best seat in the house.

Harpo Studios

The Demolition Permit

Demolition Permit Filed for Another Chicago Water Tank

Chicago Water Tank 2210 South Grove

Say goodbye to the Chicago Water Tank atop 2210 South Grove Street. Of course, the bridge house stays. 

Chicago Water Tanks are a vanishing breed. It had been a while since a demolition permit has come through — in fact, the permit filed in March for 2515 South Wabash was the only one so far in 2016 — but ever since the city made it much easier to destroy them, rather than keep them, they’ve been removed from the skyline a lot lately.

And now another. The water tank atop the much-graffiti’d 2210 South Grove Street was given last rites yesterday. Bummer. It had been tagged often, giving it a very distinct, colorful presence, especially if you’re walking across the 18th Street Bridge, where you can get a great shot of it along with the bridge house over top of the South Branch.

Chicago Water Tank 2210 South Grove

Chicago Water Tank 2210 South Grove

Chicago Water Tank 2210 South Grove

The Demolition Permit.

Construction Update: McCormick Place Event Center

McCormick Place Event Center

The McCormick Place Event Center and the Marriott Marquis Chicago.

Yes, DePaul University will play its basketball games here. But it will be much more than a basketball arena.

The new McCormick Place Event Center is being constructed in the Prairie District of the South Loop. In addition to being a 10,000-seat arena, the Event Center is also expected to host concerts, conventions, business meetings, and other sporting events not featuring the Blue Demons.

The architect of record for the McCormick Place Event Center is Curtis Moody, of Moody Nolan, while Pelli Clarke Pelli and Goettsch Partners lead a who’s-who of architecture firms also involved in the project. Similarly, Clark Construction is the general contractor, but you’ll find a number of other companies involved in construction, including Bulley & Andrews.

They hoop (see what I did there?) to have the court open in time for the 2017-18 NCAA basketball seasons.

Tower Crane Update: There Won’t Be One at 151 North Franklin

https://twitter.com/BuildUpChicago/status/753781369000656896

https://twitter.com/BuildUpChicago/status/753752507982151684

You can imagine my distress. Just hours after penning a post about the number of permitted tower cranes that had yet to be planted around Chicago, I wandered past 151 North Franklin and couldn’t believe I had left it out. I got home and leafed through the permits, and lo and behold…there wasn’t one.

How could that be? The CNA Center is going to be 35 stories high! How can that be accomplished without a tower crane?

The answer? A clip-on. Like the neckties we wore as kids. Sort of. I’m told by folks at Lendlease, the general contractor for this Loop office tower, that the crane to be used will attach to the building itself, and move higher with the tower as construction progresses. Which sounds cool enough to be an adequate substitute for the real thing.

https://twitter.com/BuildUpChicago/status/753968058515927045

Twitter. It’s how I keep myself amused.

In the meantime, Lendlease is doing all kinds of cool stuff at 151 North Franklin Street. As you’ll see by scrolling through the following photo gallery:

 

Demolition Update: Rush University Medical Center Tear-Downs

Rush demolition

Only a portion of the Senn Building remains, of the four structures demolished at Rush University Medical Center.

It was built in 1903. The Senn Building, at Rush University Medical Center, is the last of the buildings remaining of the four permitted for demolition back in September of 2015. The others, Rawson, Jones, and Murdoch, are rubble and dust and memories already. The plan, for now, is not to replace the structures, but rather to leave open green space.

A Simpson-Querrey Tower Crane Blooms in Streeterville.

Louis A. Simpson and Kimberly K. Querrey Institute for BioNanotechnology in Medicine

Tower Crane alert!

They’ve been digging a hole — a real big hole — since breaking ground in May of 2015 at 303 East Superior Street in Streeterviile for Northwestern University’s Louis A. Simpson and Kimberly K. Querrey Institute for BioNanotechnology in Medicine. This is Phase One, which calls for a 14-story tower designed by Bridget Lesniak of Perkins + Will that will fully integrate with the Robert H. Lurie Medical Research Center next door. Phase Two will add an additional 16 stories atop Phase One.

The Chicago Architecture Blog spotted a new tower crane stub against the north wall of the pit. How did I miss this one coming? It didn’t make my list of six to watch for because it’s been so long — January 26th — since the City of Chicago filed the tower crane permit. So I simply failed, again, to scroll far enough.

There’s another surprise ahead for me, though. There are two tower cranes permitted for the site. One for the north end, one for the south end. Will the south crane be coming any day now? Or will the north have a chance to get some work done before the second crane arrives?

Oh my goodness, do you realize what this is? North vs South! It’s a Tower Crane Civil War!

Tower Crane Update: Church of Jesus Christ of Latter-day Saints

Church of Jesus Christ of Latter-day Saints

McHugh Construction’s Morrow tower crane rises in the distance.

‘Tis time for another installment of the three tower crane updates from early July, when three stubs were anchored into the ground around Chicago. Monday, the DePaul School of Music got all the attention. Yesterday, 8 East Huron. Today, it’s the Church of Jesus Christ of Latter-day Saints meetinghouse at 822 North Clark Street in Near North.

This is another of those pretty yellow Morrow cranes. They’re like sunshine on a cloudy day.

Quick Look: Marriott Marquis Chicago Getting Connected

Marriott Marquis Chicago

Steve’s out, and a big yellow crane is in, setting the pedestrian bridge in place.

Part of The Collection at McCormick Square, the Marriott Marquis Chicago hotel is growing by leaps and bounds in the South Loop. There will be two pedestrian bridges included in the new development, one connecting the Marriott to the McCormick Place Events Center, and one that will carry people over Cermak Road, between the hotel and the West Building of McCormick Place.

That second bridge is half in place. Not quite connected to the West Building yet, it’s just kinda hanging out over the sidewalk along Cermak.