More Harpo Studios demolition, from ground and air

https://twitter.com/SarahJindra/status/766020742823698432

You get a much better picture of the extent of demolition at Harpo Studios if you have a helicopter. Twitter user @SarahJindra of WGN-TV has one, and she put it good use Wednesday, hovering above the West Loop to grab the above shot. Sure, she probably checked on traffic and news and such, but demolition and construction is a chopper’s true calling.

Me? I stayed on the ground, conserving fuel. But I took a few shots myself:

A 5-day Tower Crane event at 625 West Adams

Pictured above is the crew from Central Contractors Service, calmly going about their day from the middle of the sky.

If you didn’t know by now, a tower crane was assembled at 625 West Adams over the past few days. Here now are several thousand photos showing the chronology of that process:

 

 

 

 

 

 

Tower Crane Update: 625 West Adams

There are tower crane parts all over the West Loop today. And you know what? It’s fantastic.

Crews continue assembly of the giant yellow Liebherr 542 HC-L 18-36 Litronic (I can read permits) at 625 West Adams.

 

Quick Look: Tower crane assemblage at 625 West Adams

625 West Adams tower crane

This massive street crane was the first piece of equipment on hand for the tower crane assembly.

Most construction companies will tell you they have their own schedules to keep, unaffected by outside influences. That’s okay. I’m still going to pretend I’m responsible for getting the tower crane on site at 625 West Adams.

Parts began arriving Thursday, and crews immediately got to work putting them together. It looks like weather may slow things down today.

 

 

Construction Update: 171 Aberdeen builds a foundation

171 Aberdeen

The non-tower crane (for now) at 171 Aberdeen casts a long shadow as morning work gets underway.

The Hartshorne Plunkard Architecture-designed 171 Aberdeen is having some foundation work done courtesy of Novak Construction, even without the benefit (yet) of the almighty tower crane. The new mixed-use project from MCZ Development (click that link. MCZ has a wonderful video introducing their building) will have 75 luxury apartments, 15,000 square feet of retail, and 40,000 square feet of office space. Plus 130 or so parking spaces to accommodate residents, shoppers, diners, and commuters.

 

Will 625 West Adams *ever* finish my tower crane?

Last night, I put instant coffee in the microwave, and almost went back in time.” Steven Wright

I’m guessing Steven Wright was not a patient man. I, on the other hand, have unlimited patience. To a point.

Power Construction is getting a lot done on the lot at 625 West Adams Street in the West Loop. But I’ll be darned if I don’t find myself looking out the window every morning and wishing I could put an instant tower crane in the microwave. Or something. To be honest, it’s not really *my* tower crane. At all.

In the meantime, take a look at what’s been done to this point on 625 West Adams, the new SCB-designed 20-story office tower from CA Ventures and White Oak Realty.

There’s still construction to watch at River Point

But it helps if you keep your eyes down, instead of up.

River Point

There’s a small corner of open space left above the arch.

Yes, there’s still a tiny bit of cladding left to install at the very top of the west-facing side of River Point, and there’s a construction elevator to finish removing. Then all that glass where is used to be will need to be filled in.

Of course, there’s a ton of work to be done inside River Point. But only a chosen few will get to see that process. Which leaves the rest of us to watch the plaza out in front of the tower, along the Chicago River.

Designed by The Office of James Burnett, the one-and-a-half-acre park will sit 35 feet above the river, with fantastic views of the Main and South branches.

Byrne Flyover Update: The Halsted bridge is almost bridged

Jane Byrne Flyover

A new section of ramp added to the east of the section just added to the west. Or something.

It was a busy weekend for McHugh Construction and the giant red Stevenson crane (we call it “Steve” around here) at the Jane Byrne Flyover. One more section of girders was added west of the Halsted Street bridge, leaving a void only the width of Halsted Street to be spanned. If you’ve got a jumping bus like Sandra Bullock drove in Speed, go ahead and see if you can shoot the gap. Otherwise, you’ll have to wait for one more weekend of work. But don’t forget, there’s no ramp to the ground on the west end of the Flyover yet, either, so check your brakes.

Demolition Update: Even Oprah’s watching the Harpo Studios demo

https://twitter.com/Oprah/status/758416437375492096

She reached countless millions of people through the work she did here. It’s no wonder Oprah Winfrey feels the sadness of watching Harpo Studios torn to the ground.

Heneghan Wrecking has been on the job for a couple weeks now, and more of the old studio disappears every day. The portion being leveled now looks like it could have been the main studio. The sign says Studio 2. Being completely unfamiliar with the layout, I have no idea. I just know it’s television history being canceled.

Sterling Bay sampling soil at 210 North Carpenter

210 North Carpenter

A soil sampling rig at 210 North Carpenter.

Sterling Bay has plans to develop property alongside the L tracks on Lake Street in the West Loop. Situated between Carpenter and Aberdeen Streets, Sterling Bay’s rendering of 210 North Carpenter shows a 13-story building that will practically kiss passing Pink and Green Line trains.

According to its website, Sterling Bay would like to have 210 North Carpenter ready for use late in 2017 or early 2018. And with a soil sampling rig on site this week, it’s very possible ground could be broken any day now. Of course, we still have to wait for a permit to be filed before construction can begin.

210 North Carpenter

A Sterling Bay render of 210 North Carpenter

210 North Carpenter

A Sterling Bay render of 210 North Carpenter

210 North Carpenter

210 North Carpenter

The soil sampling rig, sampling soil.

210 North Carpenter

This fancy Google Map shows the location of 210 North Carpenter.