Will 625 West Adams *ever* finish my tower crane?

Last night, I put instant coffee in the microwave, and almost went back in time.” Steven Wright

I’m guessing Steven Wright was not a patient man. I, on the other hand, have unlimited patience. To a point.

Power Construction is getting a lot done on the lot at 625 West Adams Street in the West Loop. But I’ll be darned if I don’t find myself looking out the window every morning and wishing I could put an instant tower crane in the microwave. Or something. To be honest, it’s not really *my* tower crane. At all.

In the meantime, take a look at what’s been done to this point on 625 West Adams, the new SCB-designed 20-story office tower from CA Ventures and White Oak Realty.

Leave a Reply