741 North Wells will be a 178-unit apartment tower. It was designed by Antunovich Associates Architects, and according to their website, will offer a mix of 70 studios, 68 one-bedroom, and 40 two-bedroom units, with “a full complement of amenities including a rooftop terrace with pool, meeting facilities, exercise area, bicycle storage, and parking for roughly 50 vehicles.” There will also be about 9.400 square feet of street-level retail space.
The City of Chicago issued permits for: The full build on 8/25/2022 Caissons and foundation on 7/19/2002 The tower crane on 6/22/2022 Demo permits for 739 N Wells and 745 N Wells on 5/12/22
Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.
The recent concrete strike claimed 311 West Huron as a victim. But only temporarily. And with that in the past, caissons are underway, and underground.
The full permit for 311 was issued on 6/27/2022, with the tower crane permit following on 7/20/2022.
Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.
Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.
“Hey, that’s topped out” I said out loud (I talk to myself constantly when I walk around town) as I neared 160 North Elizabeth in the Fulton Market District. And it usually doesn’t take long for a topped-out tower to drop the tower crane. Sure enough, one day after setting our crane count at 20, came word that we’d already dropped into the teens. Ah, progress.
160 North Elizabeth seemed to go up in a hurry. This is progress by Clark Construction as of Friday, July 29, with the tower crane still intact:
Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.
Not only is the tower crane up at 920 North Wells, but there’s construction fencing up in the next block south on Wells Street. Call it 868 North Wells or 210 West Chestnut, but you better call it soon, because that fence means demolition is imminent for the former Irwin A Moon building on the Moody Bible Institute campus. Demolishing it will make room for 878 North Wells, the 25-story, 428-unit second tower on JDL Development’s North Union agenda. All we need do now is watch for the demo permit.
Tower crane enthusiasts are salivating.
Today’s gallery is a two-fer. You get to see 920’s brand-spankin’-new tower crane, and you get a few shots thrown in of 868 before its demise. Sorry I wasn’t patient enough to wait for the sun to show up. Enjoy.
From the LFrom the L (return trip)
Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.
A demolition permit was issued 11/05/2021 to make space A pile and foundation permit was issued 11/24/2021 A permit to build through the third floor was also issued on 11/24/2021 A tower crane permit was issued 11/30/2021 A full permit for 27 stories was issued 02/04/2022 A hoist permit was issued 02/09/2022
And now, lots of photos of a little bit of glass. But it’s not just any glass; it’s the first glass.
Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.
A permit was issued May 23rd for a five-story “inpatient hospital building” at 516 South Loomis. Earlier anticipation of this project may show an address of 1400 West Harrison. Either way, this is the place. Rush is developing the hospital along with Select Medical.
This is what Rush had to say in a news release for the groundbreaking:
Select Medical and Rush University System for Health held a ceremonial ground-breaking to celebrate the new RUSH Specialty Hospital being built on Chicago’s West Side.
The 100-bed facility will be a combined critical illness recovery and inpatient rehabilitation hospital on the RUSH University Medical Center campus. The hospital is slated to open in 2024 and will feature 44 critical illness recovery and 56 inpatient rehabilitation beds.
“It is the beginning of what will be excellent care for our community,” said RUSH CEO Dr. K. Ranga Rama Krishnan.
To celebrate the construction of the future hospital, RUSH and Select Medical executives were joined by local leaders, including 28th Ward Alderman Jason C. Ervin and Illinois state Rep. Lakesia Collins.
“It’s a phenomenal partnership that speaks to innovation and brings patients the care they need when, where and how they need it,” said RUSH University Medical Center President and CEO Dr. Omar Lateef.
Together as partners, Select Medical and RUSH are delivering a world-class acute to post-acute continuum of care for Chicagoans.
“The promise of excellence is often achieved through our joint ventures,” said Tom Mullin, executive vice president of hospital operations for Select Medical.
In addition to the new RUSH Specialty Hospital, Select Medical contributed 63 of its outpatient centers to the joint venture. Today, those locations are rebranded RUSH Physical Therapy, and the footprint has expanded to 71 centers, including 19 dedicated to pediatrics under the RUSH Kids Physical Therapy brand.
Power Construction is the general contractor, with assistance on concrete from Adjustable Concrete Construction. Stalworth Underground rigs are on site drilling caissons. Like I said, this is a very busy two-block area, with the Joan and Paul Rubschlager Building nearing completion, along with its adjoining parking garage. The photos below include all three projects.
Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.
1044 West Van Buren was part of Chicago’s mini growth spurt of tower cranes in late May. And it’s doing what tower cranes do: turning empty lots into new buildings. This one in particular, designed by Antunovich Associates for Tandem (with Adjustable Concrete on concrete duty), will rise to 18 stories and deliver 196 apartments to the south end of the West Loop.
Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.
It took <check’s sun dial> less than two weeks for Power Construction and Stalworth Underground to get caissons drilled at 920 North Wells. I’ve left dirty dishes in the sink for longer than that. Regularly. But there’s no time to be wasted on JDL Development’s latest endeavor, the North Union mega project, so it’s out with caisson equipment, and in with the earth movers. They’ve got a foundation to dig out, not just for the building, but also for the tower crane, and Manitowoc MD485 to be precise, which received a foundation permit of its own on Tuesday, May 17.
Since I once again fell asleep on the job, the following gallery includes photos of caisson work taken May 12, and post-caisson work taken May 19.
Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.