110 North Wacker gets its foundations on

 

110 North Wacker Foundation work

Foundation work is underway at 110 North Wacker, as Case Foundation gets busy in The Loop.

The rubble of the old Morton Salt Building (or the GGP Building–Don’t @ me) is long gone, and now Case Foundation is on the job, doing the dirty work to get 110 North Wacker started.

A permit was issued by the City of Chicago on April 9, allowing work to be done on the two below-grade levels, on up to the 4th floor. We’re hoping for a tower crane permit sooner rather than later to get this one up to its ultimate 54-story height, but that might take some time. But don’t worry; there’s already plenty to see. Get yourself a comfy lawn chair and go hang out on the Washington Street Bridge and watch the show.

145 South Wells will soon add a tower crane to The Loop

145 South Wells May 2018

Case Foundation has moved their equipment onto the 145 South Wells construction site.

We figured 145 South Wells would be the first project stepping up to fill the tower crane void in The Loop. Hard to believe, but it’s been more than a year since The Loop’s last tower crane, at 151 North Franklin, came down from the sky. The only other potential candidate to put one up is 110 North Wacker, but we won’t see a tower crane there for some time yet. But this 20-story office tower from Moceri + Roszak should get the job done very soon.

145 South Wells received a foundation permit from the City of Chicago back in November of last year. And then last week, it got a tower crane permit. Case Foundation let us know a few weeks ago that caisson work would get started here soon, and sure enough, they’ve moved foundation equipment onto the site.

The new tower is a design by Thomas Roszak Architecture, who also designed the tower-crane-worthy LINEA Apartments at 215 West Lake Street. Clark Construction will serve as general contractor.

If you’re wondering where Clark has been in the Chicago Tower Crane Survey, 145 South Wells marks their return to our list, with their most recent entry being at 8 East Huron in River North. (You may also see Adjustable Forms markings on this crane. They’re serving as the masonry contractor, and that usually means they are responsible for the tower crane.)

110 North Wacker earns a foundation permit

110 North Wacker

A rendering of 110 North Wacker, which received its foundation permit from the City of Chicago Monday, from Goettsch Partners.

A foundation permit was issued Monday for 110 North Wacker, the 54-story office tower that will replace the now-demolished (and much-photographed-in-the-process) Morton Salt Building. Case Foundation will be out on site in the very near future, handling the foundations alongside general contractor Clark Construction.

All yous up there in the surrounding high-rises, get those demolition cameras down, put up your construction cams, and be ready to send in your bird’s-eye views!

I’ve seen it now with my own eyes: Morton Salt/GGP is gone

110 North Wacker demolition April 2018

Proof that the sun will still shine, even after a building is demolished.

Sure, there are tons of rubble to be removed. And still a lot of excavation to be done. But as for the building itself, the former Morton Salt Building, and more recently the GGP HQ, is history. Better get out there while you can and enjoy the unobstructed views of the Boeing Building, the Civic Opera House, and more, before work on the new 110 North Wacker starts going skyward. (It’ll be a while, though.)

 

All of the Morton Salt Building demolition pictures

It’s gone now.

The former Morton Salt building, more recently the former home of GGP (General Growth Properties) at 110 North Wacker Drive, is a dirt lot now, as can be seen in the above photo shared by Twitter user @JoshatNRDC. (Great view of the new tower construction, Josh! I’ll bring the coffee if I can borrow your windows for a few hours a day.)

You can kinda sorta watch the demo work by Heneghan Wrecking along the way in the photo gallery that follows. Coming soon: a shiny new 54-story office tower from Howard Hughes Corporation and Riverside Investment & Development, designed by Goettsch Partners.

More destruction at GGP/the former Morton Salt Building

The video above was taken Thursday from across the Chicago River, looking through the windows of 110 North Wacker as Heneghan Wrecking worked from the inside out to demolish the six-story building. There are about four million office windows around this site with better views than I can get, so if you’re in one of those offices, share your views with the rest of us!

 

 

General Destruction has begun at the General Growth building

GGP Demolition 110 north Wacker

Big chunks are missing from the GGP building at 110 North Wacker. The barge is catching them.

It feels good to write something about activity in The Loop again.

The former GGP headquarters at 110 North Wacker Drive in The Loop has begun to crumble into the Chicago River. Not by accident, of course. And not actually into the water. There’s a barge out there on the river, and Heneghan Wrecking is using it to haul away debris from the demolition of the six-story building, making space for the much-anticipated 54-story, Goettsch Partners-designed office tower 110 North Wacker, from the Howard Hughes Corporation and Chicago’s Riverside Investment and Development.

The start of demolition at 110 North Wacker immediately vaults the site to the top of the official Tower Crane Anticipation list. Though that could change, if 145 South Wells gets underway. Stay tuned.