Reilly gives Dana Hotel the business, while blocking business expansion

Dana Hotel

Rendering of the proposed Erie Street Hotel from 42nd Ward office.

Dana Hotel

What Alderman Reilly’s email did to the proposed Erie Street Hotel. Basically.

It’s not often a building gets torn down before it’s even approved.

It case you missed the news (Crain’s nails it here) 42nd Ward Alderman Brendan Reilly crushed the Dana Hotel’s dream of expanding its current operation Friday afternoon in an email that left no doubt as to where the alderman stands on the proposal.

In laying the smackdown on the “Erie Street Hotel” and the buildings along Erie Street it would have demolished in the process, Reilly instead demolished the hotel itself, stating that feedback from surrounding neighbors paints the Dana as a bad neighbor, creating traffic problems, noise problems, idling-truck-pollution problems, you name it.

But there’s a sliver of hope.

(1) Spend the next 12 months working to improve operations: (a) acknowledge (rather than deny) & address chronic quality-of-life complaints about the Dana Hotel; (b) improve neighbor relations with permanent removal of nightclub/dance operations; and (c) better manage curbside loading/double parking/traffic flow issues stemming from Valet, Taxicab, UBER, Party Buses and Trolley conflicts.
(2) Forgo a Planned Development and determine what can be developed under existing development entitlements and zoning limitations that apply to a DX-5.
Yep. If the Dana Hotel figures out a way to be good neighbors, and can work out a plan to development without changes to current zoning, the alderman just might reconsider the expansion come 2018.
You can view the email in its entirety here 

Take a walk around McDonald’s

McDonald's HQ

The view from the B.U.C. HQ is still somewhat limited, until McDonald’s rises a few more floors.

If you live in a West Loop condo with a nice balcony (or a drone), you might just have a great view of construction from above the new McDonald’s Headquarters. For the rest of us, circling the block bounded by Randolph, Carpenter, Washington, and Aberdeen is the only way to get a good look at proceedings. So that’s what I did.

As Hubbard221 nears the top, 412 North Wells rises to the L

You can get a train’s-eye view of 412 North Wells right now by taking a relaxing Brown Line ride from the Merchandise Mart up to the Chicago Ave stop. Linn-Mathes is pushing the 9-story office building skyward, now that the residential tower next door, Hubbard221, is nearly topped out. (Is that 22 stories I count?)

Hubbard221 is the 193-unit apartment tower from developer Centrum Partners and designer Hirsch Associates Architects, the team that just saw a tower crane rise on their Wicker Park Connection property. As for this tower crane, it now has double duty to pull, as it tops off the taller tower while beginning to stretch the smaller structure vertically.

 

Another Flag, Another Tank, Another Crane, for another Friday

Revisiting a very busy section of the West Loop.

In the foreground, the tower crane at the McDonald’s Headquarters site. To the left, a full view of the tower crane at 171 Aberdeen.

The banner yet waving is atop Venue One.

The water tank belongs to 1035 West Lake Street.

Have a great weekend, construction nerds!

 

Alta Roosevelt nears the top

Alta Roosevelt April visit

Alta Roosevelt cuts an imposing figure in the South Loop.

If you walk through the South Loop this weekend, stop by Alta Roosevelt at 801 South Financial Place and tell me if you think that is one tall tower. Spoiler Alert: It is. And here’s why: Walsh Construction has stacked a whole bunch of floors atop other floors.

I waited around long enough this week for Alta Roosevelt herself to start whispering secrets, and she tells me the 27th floor of the tower has been poured. She also said structural pours for the garage are complete after recently doing the last deck. She is quite proud of accomplishing that feat.

A reminder to you that Alta Roosevelt is a development from Wood Partners, and a design by Pappageorge Haymes Partners. bringing 496 new apartments to the neighborhood where Financial Place and Polk Street meet, one small block east of South Wells. While there’s no immediate danger of losing its pretty yellow tower crane, topping out is likely by early June.

More staring at the rebar jungle that is One Grant Park

One Grant Park

Can I hang out down there, if I promise to be reaaaalllly careful?

One Grant Park looks like a playground. It isn’t, of course. Unless you’re skilled laborers paid to work there, and then I bet it’s all-day fun.

For now, One Grant Park is still seeing most of its action below street level. There are tunnels and rings of rebar running throughout the site, like a corn maze on an Iowa farm, minus the tractor rides and hay bales. It’s cool enough to stand around and watch, that maybe McHugh Construction will put a gift shop at the exit. Some hot apple cider and a scale model of Rafael Viñoly Architects‘ tower would make nice Christmas gifts, no?

Quick Look: The Wicker Park Connection tower crane is up

Wicker Park Connection tower crane

The finished tower crane over the Wicker Park Connection, Monday evening.

It got started over the weekend, and by Monday evening it was completed. The Wicker Park Connection can begin going vertical, now that there’s a tower crane on site. We watched most of the erecting from the B.U.C. HQ, but a well-timed going-away dinner (Bon Voyage, Steve!) on Division Street meant a good look at the new kid on that block.

Continue reading

Updating the tower crane updates

Wicker Park Connection tower crane

The brand new crane at the Wicker Park Connection Monday evening.

Turns out, tracking tower cranes in Chicago can be exhausting.

Optima II tower crane

Tuesday, the crane was coming down from Optima II.

We were at 31 Sunday with the loss of 1001 West Chicago’s crane, but then 1101 South Wabash had its crane in the air, but under (my) radar, and the Wicker Park Connection, which had planted a stub, finished its crane. That made 33. For, like, an hour. Because yesterday I noticed the luffing crane coming down from atop Optima II in Streeterville. (That crane seemed to be there for about 9 years, didn’t it?)

Long story longer, I believe there are now 32 active tower cranes in Chicago. *This is an unscientific poll.

Remember, there are stubs planted at One South Halsted and the Cook County Central Campus Health Center that should be up and running soon. Essex On The Park, Aloft Chicago Mag Mile, and Nobu have been issued crane permits. But 3Eleven, the Landmark West Loop, and (I think?) 171 Aberdeen have topped out, so we could lose those cranes any day now.

Maybe in the next few days, we can speculate about which just-underway or soon-to-be-started projects will require tower cranes. You know, McDonald’s “vendor village”, Hoxton Hotel, 808 West Van Buren, and the like. What about 508 West Diversey? That’s 12 stories. Yeah, this seems like a conversation for another day.

Scratch 1101 South Wabash off the “Waiting For Tower Cranes” list

1101 South Wabash tower crane

A new tower crane hovers over 1101 South Wabash.

No longer just a large excavation pit, 1101 South Wabash now has a tower crane to help erect the 30-story hotel coming to the South Loop site. Apparently the shiny red crane has been there almost a week now, but I neglected it for a few days. Sorry, crane. Nothing personal. Ya know I love ya.

According to the CTBUH, this is a development from SB Yen management Group in Hinsdale, and will be the Hilton Homewood Suites and Wabash Suites Hotel.

The Ardus begins caisson work at 676 North LaSalle

The Ardus caisson work

Chicago, say hello to my new favorite construction crew member.

Tuesday was a big day in the life of The Ardus. A crew from Michels Corporation began drilling caissons at 676 North LaSalle Street in River North, even as the existing building next door continues its gutting and transformation. Booth Hanson has designed 149 apartments to be built into the new and existing structures for Cedar Street Companies. One of those companies, Method Construction, is the general contractor.

Also yesterday, The Ardus received its full building permit from the City of Chicago.

676 North LaSalle The Ardus

The full building permit arrived in the mail yesterday.

The Caissons

The Renovation