
The finished tower crane over the Wicker Park Connection, Monday evening.
It got started over the weekend, and by Monday evening it was completed. The Wicker Park Connection can begin going vertical, now that there’s a tower crane on site. We watched most of the erecting from the B.U.C. HQ, but a well-timed going-away dinner (Bon Voyage, Steve!) on Division Street meant a good look at the new kid on that block.
- Sunday morning, a crane-building crane went to work.
- Getting ready to lift the first section of the tower.
- And the tower starts to climb on the stub.
- Lifting the top into place.
- The top is on.
- Hoisting the jib.
- NOPE
- Tuesday afternoon shot of the finished crane.
Look what I found Thursday morning: The full building permit came through on Wednesday.

The Full Permit.