Hyde Park Labs (Harper Court Phase II) has topped out

The tower crane that topped out Hyde Park Labs, Hyde Park, Chicago.

As reported by Urbanize Chicago earlier this month, Hyde Park Labs has topped out at 5207 South Harper in the Hyde Park Community Area (and neighborhood.) The 13-story, 302,000-square-foot facility includes a 125-space parking garage, plus nine levels of lab and office space. Its anticipated opening is in the fourth quarter of 2024.

Congrats on the topping out to:

Trammell Crow Company and Beacon Capital Partners, the developers.
Elkus Manfredi Architects, the design architect.
Power Construction, general contractor, with an assist from UJAMAA
Adjustable Concrete Construction, concrete contractor.

I hope you all went to the ground floor and got one of those fried catfish Po-boys and a frozen hurricane.

Photos from February 26 (photos of construction, not of the Po-boys):

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

Hyde Park Labs (Harper Court Phase II) has gone 3-D in Hyde Park

Post-demolition, pre-construction for Hyde Park Labs at 5201 South Harper, 3/1/2023.

Made my first visit to Hyde Park Labs (at that link, click on “View Brochure” for everything you’ll ever want to know about Hyde Park Labs) at 5201 South Harper since this was still a fenced-off dirt lot waiting to get started. Well, not only has it started, but the crane’s in the air and the core has risen to — let’s call it the fifth floor. They’re going up to 13.

Let’s see if I have all the players correct on this project, the 2nd phase of Harper Court:

Trammell Crow Company and Beacon Capital Partners are the developers.
Elkus Manfredi Architects is the design architect.
Power Construction is the general contractor, with an assist from UJAMAA
Adjustable Concrete Construction is the concrete contractor.

Now, how ’bout some permit dates:

Demo of the single-story building previously on this site, issued 1/17/2023
Tower crane, issued 2/22/2023
“Selective” demo for existing building & parking garage, issued 4/6/2023
Caissons, issued 5/9/2023
Full build, issued 6/15/2023

And finally, some photos of progress, taken August 21:

Stuff That’s Done: The Woodlawn Residential and Dining Commons at the University of Chicago

The Woodlawn Residential and Dining Commons at the University of Chicago

The new Woodlawn Residential and Dining Commons is open on the University of Chicago campus. The Commons is a joint development between the University and Capstone Development Partners. It was designed by Boston’s Elkus Manfredi Architects, and was built by Turner Construction. The 16- and 7-story buildings contain almost 900 rooms and 1,300 beds.

University of Chicago getting Woodlawn Residential and Dining Commons ready for 2020-21

Is this rendering from U of C, the Woodlawn Commons is to the left.

A 16-story tower and a zig-zagging maze of a 7-story building comprise the new Woodlawn Residential and Dining Commons. It will include, as you may have guessed, housing and dining facilities for University of Chicago students, as well as amenities and outdoor spaces.

The Woodlawn Commons is a joint development between the University and Capstone Development Partners. It is being built by Turner Construction, as is the David M. Rubenstein Forum going up one block east.

The design is by Boston’s Elkus Manfredi Architects. The firm’s CEO and founding Partner David Manfredi earned his masters degree here at U of C.

Here’s some uchicago news you can use to learn more (lots more) about Woodlawn Commons. The University expects to have it open for the 2020-2021 school year.