More photos than words from LG Group’s HUGO in River North by NORR.
Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.
No longer two large excavation sites, HUGO is beginning to sprout like two spring flower beds in the 400-block of West Chicago Avenue. That’s all thanks to developer-slash-general contractor LG Group, whose task it is to bring this two-sided NORR design to life.
Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.
An active day at 411 West Chicago, the east “half” of HUGO
Foundation work is complete at River North’s HUGO residential development, and now developer-slash-general-contractor LG Group is beginning the groundwork for the two nine-story buildings designed by NORR.
The west half of this project, 751 North Hudson, got a hoist permit Wednesday; the 411 West Chicago side got one a day prior. Building permits were issued (751) July 14 and (411) August 5, 2021.
You can see photos of work at both sides of the HUGO equation below, along with the Pesky Building In The Middle (previously known as 415 West Chicago) they’ll surround.
Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.
What do you do when there’s a building in your way? HUGO around it.
That’s what LG Group is doing atHUGO in River North. There’s a pesky three-story structure at 415 West Chicago Avenue that LG won’t let get in the way of this dual-building development.
On the east side is 411 West Chicago. On the west side is 751 North Hudson. The two roughly-L-shaped nine-story buildings will combine for 227 apartments and 19,000 square feet of retail space. NORR is the design architect, while LG Group is doing their own build. Yep, a double-duty tower crane and a double-duty developer/GC. HUGO, LG!
Full building permits were issued for each half of HUGO: 411 West Chicago got one on 8/5/2021, and 751 North Hudson on 7/14/2021. The tower crane permit came through on 2/9/2022.
Foundation work is in progress, as evidenced the two large holes in the earth on either side of aforementioned existing structure.
Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.
I don’t usually do a tower crane count mid-month, but dang, only five of them?
Yeah, our tower crane count has dipped to five, with 2050 West Ogden and 300 North Michigan recently (or currently) being taken down.
But take heart, Chicago. We have more on the way soon, with eight having permits and expected to be in the air relatively soon:
The Obama Center has a permit for three of them
164 North Peoria has wrapped up caisson work.
1306 E. 61st (U of C) has a permit
ALLY Lincoln Yards has a permit
513 South Damen has a permit
4611 North Broadway has a permit
410 South Wabash has completed caissons, but we’re still waiting for a tower crane permit for it.
Don’t forget, 1000M (1000 South Michigan) had a stub in the ground, but the crane was never erected. And 178 West Randolph and 320 South Clinton have permits, but . . . who knows.
Let’s keep an eye on LG Development’s HUGO project at Hudson and Chicago. Maybe one tower crane to build both nine-story buildings?
166 North Aberdeen is in caisson mode. That’s a 20-story tower, and will need a TC for sure.