Riu Plaza Hotel shoots up from Streeterville

Riu Plaza Hotel, 150 East Ontario in Streeterville.

And now, for another Streeterville high-rise in a tight lot, the Riu Plaza Hotel. The 28-story, 390-key hotel looks to have reached the 23rd or 24th level. That’s W.E. O’Neil putting in the work as the GC. The hotel is a design by Lucien LaGrange Studio. The Prime Group is the developer. Opening is slated for late 2024.

Photos from this week, and late March

With caissons in the ground, it’s pile-driving time at RIU Plaza Hotel

Yes, caissons are done, but not foundation work, on the RIU Plaza Hotel site at 150 East Ontario in Streeterville. W.E. O’Neil and crew are driving piles into the soil to help support the weight of the 28-story, Lucien Lagrange-designed hotel.

Hey, you know what we should be seeing soon here? Yep. Tower crane permit.

Finally! RIU Plaza Hotel construction has begun at long-vacant Streeterville lot

RIU Plaza Hotel rendering from Lucien Lagrange Studio.

The lot that sat empty at 150 East Ontario for what seemed like an eternity is finally seeing action. Big action.

The RIU Plaza Hotel construction has begun in Streeterville. The City of Chicago issued a permit for caissons and foundation on July 19 for a 28-story, 390-room hotel. W.E. O’Neil is the general contractor. Lucien Lagrange Studio is the design architect. And that’s a big yellow Keller North America rig drilling caissons.

We stopped by in late July to have a first look at site prep, then headed back over this week to see the caisson action. And action we got. Very happy to see work started on this site.

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago.

Make a one-time donation

Choose an amount

¤1.50
¤5.00
¤10.00

Or enter a custom amount


Your contribution is appreciated.

Donate