
One big pile of slop, waiting to be heaved into a truck and hauled away from Wolf Point East.
Just before this story went to the presses, a permit came through for a tower crane at Wolf Point East. A Liebherr 420 EC-H 16 to be precise. A SHINY YELLOW TOWER CRANE, to be technical.

Wolf Point East got a tower crane permit on Monday.
When I posted an update on foundation work at Wolf Point East at the beginning of November, there was one factor involved I hadn’t been aware of: flooding.
We were away in Australia (you may have noticed some posts from that trip) when torrential rains caused flooding along the Chicago River in October, and the construction pit at Wolf Point East took the brunt of it, filling with water completely. (You can scroll down this photo gallery from Curbed for a look at the deluge) That explains the mud that remains on site. I was back there over the weekend, and noticed just how sloppy things were, but that isn’t stopping work from continuing. You can see how much deeper work has gone, as Walsh Construction oversees progress on the six subterranean levels of the 60-story tower.