
Foundation work is ongoing at 8 East Huron in River North.
With two buildings torn down at the northeast corner of State and Huron Streets, a new residential tower is starting to grow.
8 East Huron is a 26-story, 105-unit building being developed by CA Ventures. (That’s CA as in Campus Acquisitions, not something from California. CA Ventures is the new branding, as of 2012.) There will be ground floor retail as well, and 30 or so parking spaces on levels 2-4.
8 East Huron is designed by Valerio Dewalt Train Associates. Clark Construction is on the build. Or, under the build, as you’ll see from the photos below.
- Down and dirty at 8 East Huron.
- Iron shoring.
- Foundation workers at 8 East Huron.
- Digging.
- And more digging.
- You’ve painted yourself onto an island.
- The Permit.
- Quality Excavation demolishes 4 and 8 East Huron.
- After demolition, touch-up work on the Consulate General of Ukraine, 10 East Huron, which remains.
- 4 and 8 are gone. 10 East Huron, to the right, remains.
- They were handsome structures.