
Time to dismantle the caisson rig and let the sheet driver get at it.
Case Foundation is done, and now it’s Stalworth Underground’s turn, as foundation work at Essex On The Park continues in the South Loop. With all the big holes drilled into the earth, up next comes the piles of sheeting stacked in the southwest corner of the site, and then Essex can get a tower crane moved in. I hope.
- There’s your sheeting, waiting to be driven into the ground. Some life, huh?









