Tower crane assembly is underway at 171 Aberdeen

171 Aberdeen tower crane

The forst section of tower crane is added to the stub at 171 Aberdeen.

Two tower crane permits. An additional foundation permit to add more caissons. Both scenarios conspiring to delay the assembly of a tower crane for 171 Aberdeen, the 11-story mixed-use apartment project in the West Loop.

But that’s all in the past. Tuesday, Central Crane Service was on site putting the crane together at long last. By the end of the day, the main shaft was up, with the cab sitting atop it. Expect the boom Wednesday, and an operational crane no later than week’s end.

Videos and photos follow:

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s