Glass goes up, tower crane comes down, at 633 South LaSalle

Carl, working high atop the South Loop, taking down the tower crane.

There’s glass, but alas, the tower crane has passed. And so 633 South LaSalle attains a couple milestones of progress.

Friday and Saturday were the crane-removal days, as you can see in Carl’s Instagram video above (give him a LIKE). That’s Central Contractors Service’s rig out there wrapping up the dismantling. As for glass installation, that’s been going on for a couple weeks now.

As a reminder: Q Investment Partners and Melrose Ascension Capital are adding 358 beds (apartments and co-living units) to the South Loop, next to Metra’s LaSalle Street station. As long as all goes to plan from here on out, those beds should be sleep-in-able early in 2025.

Photos were taken on the second day of crane removal, April 6:

Enjoying the photos? Metra and CTA rides (and Amtrak trains to Milwaukee), Zipcars, Divvy Bikes, camera lenses, domain fees, snacks & energy drinks, and comfortable walking shoes add up. You can help offset expenses by making a greatly-appreciated donation to Building Up Chicago using the form below.

Make a one-time donation

Choose an amount

$3.00
$5.00
$6.33

Or enter a custom amount

$

Your contribution is appreciated.

Donate

Leave a Reply