Now topped out, glass is in session at Renelle on the River

Yep, we just shared two tweets with you. That’s because Renelle on the River celebrated two important milestones: The first pieces of glass, and the last piece of steel.

As you can see in the video shared by bKL Architecture principal Thomas Kerwin, the first level of cladding installation is underway on the bKL-designed tower. And McHugh Construction was kind enough to share with the world that Renelle’s steel has topped out. That means the next milestone will be the sad one, when the tower crane comes down. And then all that’s left for Renelle on the River to accomplish is to open those incredible condominiums to residents, and that’s expected to happen early in 2019.

 

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.