McHughtel construction gets underway in the South Loop

123 East Cermak Road McHughtel

Caisson equipment as far as the eye can see.

McHugh Construction crews are rolling rebar cages and digging holes and trenches at the site of McHugh’s new hotel project at 111-123 East Cermak Road in the Prairie District, and that means construction is underway.

The 23-story, 466-room hotel is a design by Antunovich Associates. The City of Chicago  filed the building permit back on December 19, and the lot has been filling up with materials ever since. Now, holes are being dug, the aforementioned rebar is being twisted, and caisson equipment is stacked and ready to be sunk into the earth. McHugh, of course, is the general contractor.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.