
Caisson equipment as far as the eye can see.
McHugh Construction crews are rolling rebar cages and digging holes and trenches at the site of McHugh’s new hotel project at 111-123 East Cermak Road in the Prairie District, and that means construction is underway.
The 23-story, 466-room hotel is a design by Antunovich Associates. The City of Chicago filed the building permit back on December 19, and the lot has been filling up with materials ever since. Now, holes are being dug, the aforementioned rebar is being twisted, and caisson equipment is stacked and ready to be sunk into the earth. McHugh, of course, is the general contractor.
- The site, from Cermak and Michigan.
- Have you ever seen a prettier collection of augers?
- Rebar crew.